Coordinated stainless steel piping, separate gas circuits and point-of-use pressure control for cell culture and fermentation equipment.
"
The client is a biopharmaceutical and biotechnology company engaged in cell culture, microbial fermentation, and biological reagent development and production. Its GMP cleanroom facilities house CO₂ incubator shakers, fermentation vessels, cell culture incubators and temperature-controlled shaking equipment. The project required centralized distribution of high-purity CO₂, nitrogen and clean dry air, with component cleanliness and local pressure control matched to the equipment and process requirements.
— CLIENT BACKGROUND
INDUSTRY PAIN POINTS & PROJECT CHALLENGES
01Connection Compatibility
Fragmented procurement can make it harder to coordinate tubing, fittings and valves. For this project, consistent connection specifications and matched components were priorities in managing potential leakage and replacement issues.
02Gas-Contact Cleanliness
The gas-contact materials and internal finishes needed to match the workshop's cleanliness requirements. Selecting suitable tubing and components was therefore part of the project specification, rather than simply choosing standard utility piping.
03Different Gases and Operating Demands
CO₂ supply, nitrogen purging and clean-air duties involved different equipment demands. The challenge was to coordinate separate gas circuits while providing suitable pressure adjustment at each point of use.
04Maintenance and Supplier Coordination
The client wanted a coordinated approach to replacement parts and technical support. A consistent supply scope would simplify component identification, maintenance planning and communication as the workshop's needs developed.
SOLUTIONS PROVIDED
01 Coordinated Piping and Component Package
LITEN FLOW supplied 316L seamless stainless steel tubing, double-ferrule compression fittings, unions, elbows, tees, gas ball valves, pressure regulators, filters and terminal gas-control components. The supply scope covered the workshop's wall-mounted and overhead gas piping equipment.
02 Separate Distribution for Three Gas Services
The project provided separate routes for high-purity CO₂, nitrogen and clean dry air. Component selection followed the intended gas service and equipment requirements, supporting culture-related CO₂ supply, nitrogen purging and protective atmospheres, and specified clean-air duties.
03 Point-of-Use Pressure Regulation
Terminal regulators and pressure gauges provided local pressure adjustment and visible readings near equipment connections. This allowed operators to set the supply to suit individual devices rather than relying on one pressure setting for every outlet.
04 Cleanliness-Focused Material Selection
316L stainless steel tubing and suitable gas-contact components were selected around the project's material and cleanliness requirements. Surface-finish specifications formed part of tubing selection, with attention to maintaining clean gas-contact surfaces throughout the supply scope.
05 Ceiling-Fed Connections Near Equipment
The supplied components supported ceiling-fed drops positioned around rows of incubator shakers and other process equipment. Bringing regulators and outlets close to the equipment made connection and routine adjustment more accessible.
06 Continuing Selection and Supply Support
Support covered component selection, pressure-range matching, connection specifications and coordinated delivery. LITEN FLOW also provided a consistent contact for subsequent replacement components and technical questions, helping the client manage the gas piping supply as a whole.
PROJECT OUTCOME
The gas distribution system is now in use, serving cell culture, fermentation and associated equipment. The project established separate gas services with local pressure control and a coordinated component supply for future maintenance. LITEN FLOW continues as the facility's long-term supplier of high-purity gas piping components.